banner 11

Testing

Home Cases

Testing

Testing

May 16, 2024

Testing

After the goods finished assembling the unit will go though test by our professional technician in testing area.

Including testing the load, noise level to see if the unit running normally.

 

All the problems will be solved before shipment. We need to ensure all the units be 100% to reach our customers.

If the units don’t go through the test will not allow to packing area.

 

All the units which through the test will comes with their own test report then send with the documents to put inside the gensets.

 

After the testing our inspector do the 2nd inspection for all the units to ready to pack for shipment.

When the payment and booking be confirmed we will load the goods to be shipped.

facebook ins
Subscribe
Please read on, stay posted, subscribe, and we welcome you to tell us what you think.
Submit

Copyright @ 2024 FUJIAN DEPCO POWER GENERATION CO.,LTD. All Rights Reserved. . Powered by dyyseo.com Sitemap / Blog / XML / Privacy Policy IPv6 network supported

Leave A Message

Leave A Message
If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.
Submit

Home

Products

whatsApp

contact